(+434) 572-2349

South Boston, VA

Altavista Water Plant

Elliott Electric completed a generator installation for the Altavista Water Plant, ensuring the facility has a dependable backup power source to maintain continuous operation during outages. As a critical piece of municipal infrastructure, the water plant required a reliable solution to protect essential systems and safeguard the community’s water supply.

Our team handled every stage of the project, from design-build planning to the installation and testing of a high-capacity commercial generator. The system was integrated to automatically engage during power loss, keeping pumps, treatment systems, and controls fully operational.

By combining our expertise in municipal electrical contracting with precise, code-compliant installation practices, Elliott Electric delivered a turnkey power solution that enhances the plant’s resilience and long-term performance.

Project Highlights:

  • Design-build commercial generator installation

  • Automatic transfer switch for seamless power transition

  • Backup power for pumps, treatment systems, and controls

  • Code-compliant installation and load testing

  • Reliable municipal electrical service for critical infrastructure